The Ontario Building Code | Types of Glass and Protection of Glass 9.6.1.4. The Internet is the obvious place to look but this can make matters even more confusing. acid or laser etched, sandblasted, ceramic fired, or embossed), except that tempered spandrel 2 glass, which may be provided with removable paper labels. Bear Glass NJ is a leading supplier of Tempered glass in NJ, and throughout the US.Tempered glass is made from normal annealed glass via a thermal tempering process in which the glass is subjected to heat till its softening point and then rapidly cooled. of Plumbing-Heating-Cooling Contractors. Where one or more sides of any pane of glass are not firmly supported, or are subjected to unusual load conditions, detailed, To be considered firmly supported, the framing members for each individual pane of glass shall be designed so the deflection of the edge of the glass perpendicular to the glass pane shall not exceed, Where interior glazing is installed adjacent to a walking surface, the differential deflection of two adjacent unsupported edges shall be not greater than the thickness of the, Float, wired and patterned glass in louvered windows and jalousies shall be no thinner than, Glass sloped 15 degrees (0.26 rad) or less from vertical in windows, curtain and window. The history of safety/tempered glass dates back quite a ways: International Residential Code (IRC), since inception in 2000; Florida Building Code (FBC), since inception a couple of years later; Uniform Building Code (UBC) since 1967, and Southern Standard Building Code (SSBC), at … Generate a code sheet that integrates with your drawing set. thx in advance. For multiple-layer glazing systems, each light or layer shall consist of any of the glazing materials specified in Item 1 above. Commercial refrigerated cabinet glazed doors. Rapidly and efficiently calculate project parameters. Specific Inspection Topics. Use is only permitted by the exception to Section 2406.2. The IBC references ASTM E 1300, Standard Practice for Determining Load Resistance of Glass in Buildings. Total glass thickness, inches (mm) of glass panes and plies. For glass sloped 30 degrees (0.52 rad) or less from horizontal. Sloped glazing shall be any of the following materials, subject to the listed limitations. GLASS AND GLAZING SECTION 2401 GENERAL 2401.1 Scope. Traditional Building Codes. Fully tempered glass installed without protective screens where glazed between intervening floors at a slope of 30 degrees (0.52 rad) or less from the vertical plane shall have the highest point of the glass 10 feet (3048 mm) or less above the walking surface. (Error code: 273), The provisions of this chapter shall govern the materials, design, construction and quality of glass, lighttransmitting ceramic and light-transmitting plastic. Types of glass and Protection of glass (1) glass sidelights greater than 500 mm wide that could be mistaken for doors, glass in storm doors and glass in sliding doors within or at every entrance to a dwelling unit and in public areas shall be, Note: On July 1, 2017, Sentence 9.6.1.4. We provide construction permit review and inspection services for Building, Electrical, Plumbing & Fire Protection systems during new construction and rehabilitation of existing structures. Leverage the full code compliance platform. By Bear Glass NJ. Interpolation between nonfactored load charts in ASTM E1300 shall be permitted. The provisions of this chapter shall govern the materials, design, construction and quality of glass, light-transmitting ceramic and light-transmitting plastic panels for exterior and interior use in both vertical and sloped applica-tions in buildings and structures. Capture and share institutional knowledge within your team and company. )Other referenced ICC Standards (ICC/ANSI A117.1-2009; ICC 300-2017; etc. The Construction & Building Regulation Division in the Community Development Department is responsible for assuring compliance with the New Jersey Uniform Construction Code. In most places, residential building codes answer the question of where is tempered window (glass) necessary. In the past, building codes were far more relaxed than they are today. A brief summary of the 2018 updates to the International Residential Code and International Energy Conservation Code. The value for patterned glass shall be based on the thinnest part of the glass. Anywhere within 5′ of a hot tub, swimming pool, spa, sauna, shower, or bathtub. Interpolation between the nonfactored load charts in ASTM E1300 shall be permitted. Save and quickly access sections most relevant to your project. ), Updated as Necessary(current as of 08/05/19), BARRIER FREE SUBCODE (Chapter 11 of IBC/2015 & NJAC 5:23-7), Residential Site Improvements Standards (NJAC 5:21), Liquefied Petroleum Gas Safety (NJAC 5:18), Public Access to Administrative Code and NJ Register, Adopted Codes and Standards, prior to 09/03/19, Administrative Rules and Related Statutes, National Standard Plumbing Code/2018, NJ ed, International Energy Conservation Code/2018, International Residential Code/2018, NJ ed, State of NJ, Dept of Community Affairs, Div of Codes and Standards, National Assoc. F g 0.5F ge (Equation24-12) where: F g = The wind load on the glass computed per Section 1609 multiplied by … In Type I and II construction, sloped glazing and skylight frames shall be constructed of noncombustible materials. When glass breaks, it often forms large, dangerous shards that can pose significant safety risks. 2018 International Building Code (2406.4.3) specifies that tempered (safety) glass is needed if all these conditions exist: The exposed area of an individual pane is greater than 9 square feet (0.84 m2). All feedback is helpful! The value for patterned glass shall be based on the thinnest part of the glass. Jersey Tempered Glass, Inc. has been providing fabricated tempered and insulated glass for residential, millwork, industrial and OEM use nationwide since 1976. Screens shall not be required for laminated glass with a 15-mil (0.38 mm) polyvinyl butyral (or equivalent) interlayer used in individual, Each pane of glass is 16 square feet (1.5 m. The highest point of the glass is 12 feet (3658 mm) or less above a walking surface or other accessible area. See differences between code years or jurisdictions. American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. International Energy Conservation Code/2015, International Residential Code/2015, NJ ed, Technical amendments of NJAC 5:23-3, 6, 7 & 12 regarding 2015 codes, Technical amendments of NJAC 5:23-3, 6, 7 & 12 regarding 2009 codes, New Jersey Administrative Codes and Related Statutes. Highlight differences between any two building codes. Click on this link for more videos on building codes, home building and doors. Nonfactored load in accordance with ASTM E1300. Tempered glass 1 must be permanently marked (e.g. Required Plumbing Fixtures - Section 2902, Chapter 3 Use and Occupancy Classification, Chapter 4 Special Detailed Requirements Based on Use and Occupancy, Chapter 5 General Building Heights and Areas, Chapter 7 Fire and Smoke Protection Features, Chapter 15 Roof Assemblies and Rooftop Structures, 2404 Wind, Snow, Seismic and Dead Loads on Glass, 2404.3 Wired, Patterned and Sandblasted Glass, 2405.2 Allowable Glazing Materials and Limitations, 2405.5 Unit Skylights and Tubular Daylighting Devices, 2405.5.1 Skylights Rated for the Same Performance Grade for Both Positive and Negative Design Pressure, 2405.5.2 Skylights Rated for Separate Performance Grades for Positive and Negative Design Pressure, 2406.4.6 Glazing Adjacent to Stairways and Ramps, 2406.4.7 Glazing Adjacent to the Bottom Stairway Landing, 2407.1.4 Glazing in Wind-Borne Debris Regions, 2409 Glass in Walkways, Elevator Hoistways and Elevator Cars, 2409.2 Glass in Elevator Hoistway Enclosures, 2409.3 Visions Panels in Elevator Hoistway Doors, Chapter 25 Gypsum Board, Gypsum Panel Products and Plaster, Chapter 30 Elevators and Conveying Systems, Chapter 32 Encroachments Into the Public Right-Of-Way, Chapter 33 Safeguards During Construction, Appendix C Group U—Agricultural Buildings, Appendix E Supplementary Accessibility Requirements, Appendix L Earthquake Recording Instrumentation, Appendix M Tsunami-Generated Flood Hazard, Section 2403 General Requirements for Glass, Section 2404 Wind, Snow, Seismic and Dead Loads on Glass, Section 2405 Sloped Glazing and Skylights, Section 2407 Glass in Handrails and Guards, Section 2408 Glazing in Athletic Facilities, Section 2409 Glass in Walkways, Elevator Hoistways and Elevator Cars. Short duration load resistance of the glass as determined in accordance with ASTM E1300 for Equations 24-2 and 24-3; or the long duration load resistance of the glass as determined in accordance with ASTM E1300 for Equation 24-4. Where used in monolithic glazing systems, heat-strengthened and fully tempered glass shall have screens installed below the glazing material. One or more walking surface(s) are within 36 inches (914 mm), measured horizontally and in a straight line, of the plane of the glazing. Glass in elevator hoistway enclosures and hoistway doors shall be laminated glass conforming to ANSI Z97.1 or CPSC 16 CFR Part 1201. )Other referenced ICC Standards (ICC/ANSI A117.1-2009; ICC 300-2012; etc. Nonfactored load in accordance with ASTM E1300. Glass doors shall remain intact following a test impact at the prescribed height in the center of the door. International Building Code/2018, NJ ed (IBC w/ NJ edits from 3.14)   * Corrected pages (NJ errata) * Corrected sections (ICC errata)Other referenced I-Codes (IFC/2018; ISPSC/2018; etc. ICC Digital Codes is the largest provider of model codes, custom codes and standards used worldwide to construct safe, sustainable, affordable and resilient structures. ft. … of Plumbing-Heating-Cooling Contractors   (800) 533-7694 or in NJ at (800) 652-7422 or (609) 987-0500, •  National Electrical Code -- National Fire Protection Assoc. Tempered Glass (Safety Glass) Old patio doors that lack tempered glass can be a safey hazard. Code calculators may not be available. ), National Electrical Code (NFPA 70)/2014(link provides access to all NFPA standards), ENERGY SUBCODE (NJAC 5:23-3.18)International Energy Conservation Code/2015 (Low-Rise Residential) ASHRAE 90.1-2013 (Commercial & all other Residential), International Residential Code/2015, NJ ed (IRC w/ NJ edits from 3.21)   *Corrected pages (NJ errata)   *Corrected sections (ICC errata)Other referenced I-Codes (ISPSC/2015; etc. The International Residential Code allows you to place a window as low as you want to the floor, and unless the piece of glass is 9 square feet or larger it doesn't have to be tempered. Tempering puts the outer surfaces into compression and the interior into tension.Such stresses cause the glass, when broken, to shatter into small granular chunks instead of splintering into jagged shards as ordinary annealed glass does. Highlight changes enacted by your local jurisdiction. Code Calculators automatically generates a detailed list of requirements. Where a horizontal rail is installed on the accessible side(s) of the glazing 34 to 38 inches (864 to 965 mm) above the walking surface. Tempered or toughened glass is a type of safety glass processed by controlled thermal or chemical treatments to increase its strength compared with normal glass. Other referenced ICC Standards (ICC/ANSI A117.1-2009; ICC 300-2017; etc.). Please refer to your copies of each publication for complete code … Nonfactored load from ASTM E1300 using a thickness designation for monolithic glass that is not greater than the thickness of wired glass. Notice: Projects allow you to save customized inputs about your building. Residential Building Codes for Safety Glass. The top edge of the glazing is greater than 36 inches (914 mm) above the floor. Any glazing material, including annealed glass, is permitted to be installed without screens in the sloped glazing systems of commercial or detached noncombustible greenhouses used exclusively for growing plants and not open to the public, provided that the height of the greenhouse at the ridge does not exceed 30 feet (9144 mm) above, Screens shall not be required in individual, Each pane of the glass is 16 square feet (1.5 m. The highest point of the glass is 12 feet (3658 mm) or less above any walking surface or other accessible area. These inputs help surface the applicable codes and requirements. ), National Standard Plumbing Code/2018, NJ ed (NSPC w/ NJ edits from 3.15), National Electrical Code (NFPA 70)/2017(link provides access to all NFPA standards), ENERGY SUBCODE (NJAC 5:23-3.18)International Energy Conservation Code/2018 (Low-Rise Residential) ASHRAE 90.1-2016 (Commercial & all other Residential), ONE- AND TWO-FAMILY DWELLING SUBCODE (NJAC 5:23-3.21), International Residential Code/2018, NJ ed (IRC w/ NJ edits from 3.21) * Corrected pages (NJ errata) * Corrected sections (ICC errata)Other referenced I-Codes (ISPSC/2018; etc. Screens are not required below any glazing material, including annealed glass, where the walking surface below the glazing material is permanently protected from the risk of falling glass or the area below the glazing material is not a walking surface. Sept. 03, 2019 All bathroom sinks should be 4-inches from the side walls, at minimum, and should also have at least 21-inches of front clearance. Tempered Glass in Doors According to the International Residential Code, you must temper all glass and panels in swinging, sliding, operable, fixed, and bifold doors, regardless of the panel’s size. Leverage the most sophisticated code compliance platform. For glass sloped more than 30 degrees (0.52 rad) from horizontal. In a. A reliable and up-to-date source of codes. For insulating glass units, all panes shall be tempered glass. The various Division of Codes and Standards programs are based on Code rooted in Law and implemented through Rule and Regulation. In structures where acid fumes deleterious to metal are incidental to the use of the buildings. The building codes are different depending on the state and country that you live in. Submit this form or email us at, Please contact support@up.codes. Where access through the door is to a closet or storage area 3 feet (914 mm) or less in depth. The rail shall be capable of withstanding a horizontal load of 50 pounds per linear foot (730 N/m) without contacting the glass and be a minimum of 1, Outboard panes in insulating glass units or multiple glazing where the bottom exposed edge of the glass is 25 feet (7620 mm) or more above any. We were built on expertise by a small group of entrepreneurs. Code calculators automatically generate a detailed list of requirements. The screens shall be constructed of a noncombustible material not thinner than No. Each pane of tempered glass, except tempered spandrel glass, shall be permanently identified by the manufacturer and ... 24.2 2010 FLORIDA BUILDING CODE — BUILDING GLASS AND GLAZING. Glass used as structural balustrade panels in railings shall be constructed of either single fully tempered glass, laminated fully tempered glass or laminated heat-strengthened glass. View a consolidated view of relevant sections tailored to your project. INTERNATIONAL BUILDING CODE Page 1 of 2 CHAPTER 24 GLASS AND GLAZING SECTION 2406.3, ITEM 10 2006 Edition IBC Interpretation No. Tempered glass required at bathroom window or not? Get everyone on the same page and streamline code research. Short duration load on the glass as determined in accordance with ASTM E1300. Tempered spandrel glass is permitted to be identified by the … 2 separate sinks built next to each other also have to have a spacing of 4-inches or more. The following is information, or links to information, concerning those Codes, Laws and Rule or Regulation. For example, tempered window glass requirements in bathrooms were not always an absolute rule, but it is now — and code dictates window replacements meet certain standards. Glazing in railing in-fill panels shall be of an approved safety glazing material that conforms to the provisions of Section 2406.1.1 . 90.1 -- American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.   (800) 527-4723, •  ASME -- American Society of Mechanical Engineers   (800) 843-2763, International Building Code/2015, NJ ed (IBC w/ NJ edits from 3.14)     *Corrected pages (NJ errata)   *Corrected sections (ICC errata)Other referenced I-Codes (IFC/2015; ISPSC/2015; etc. The value for sandblasted glass is for moderate levels of sandblasting. Any glass within 24-inches of a door along the same wall as the door or perpendicular to it that is less than 60-inches above the floor must be safety tempered glass. Tempered glass is made to reduce the chances of injury or death. The following shall be considered specific hazardous locations requiring safety glazing materials: 1. Glass in elevator car enclosures, glass elevator car doors and glass used for lining, The glass in glass elevator car doors shall be not less than 60 percent of the total visible door. 10-08 Issued: 11-26-2008 BU_06_10_08 2406.3 Hazardous locations. The bottom edge of the glazing is less than 18 inches (457 mm) above the floor. The installation of replacement glass shall be as required for new installations. Glass installed in hoistways and hoistway doors where the hoistway is required to have a, The glass in glass hoistway doors shall be not less than 60 percent of the total visible door. The New Jersey building code requirements for first floor egress windows are a 3 foot high by 4 foot wide window with a net clear opening of 20 inches high and 20 inches wide. 2016-08-10 16.06 ... No, not by code. Surface critical code sections based on your project inputs. Please click here to subscribe to the Division of Codes and Standards e-list to receive notifications of rulemaking activity. Print chapters, sections, and subsections for frequently used code. Nonfactored load in accordance with ASTM E1300. Glazing shall comply with the test criteria for Category II, unless otherwise indicated in, Multipane glazed assemblies having individual panes not exceeding 1 square foot (0.09 m, Glazing in an individual fixed or operable, Glazing where the bottom exposed edge of the glazing is less than 60 inches (1524 mm) above the plane of the adjacent walking surface of, Glazing adjacent to the landing at the bottom of a, Glazing materials shall not be installed in, Glass installed in exterior railing in-fill, When the top rail is supported by glass, the assembly shall be tested according to the impact requirements of, Glazing in multipurpose gymnasiums, basketball, Glass installed as a part of a floor/ ceiling assembly as a walking surface and constructed with laminated glass shall comply with ASTM E2751 or with the load requirements specified in. Your selected jurisdiction and code year has limited functionality. Where to install windows with tempered glass is not just dictated by the height of the window. (617) 770-3000, •  ASHRAE Std. Glass sloped more than 15 degrees (0.26 rad) from vertical in skylights, Wired glass sloped 15 degrees (0.26 rad) or less from vertical in windows, curtain and window, Wired glass sloped more than 15 degrees (0.26 rad) from vertical in skylights, sunspaces, sloped roofs and other exterior applications shall be designed to resist the most critical of the combinations of, Patterned glass sloped 15 degrees (0.26 rad) or less from vertical in windows, curtain and window, Patterned glass sloped more than 15 degrees (0.26 rad) from vertical in skylights, sunspaces, sloped roofs and other exterior applications shall be designed to resist the most critical of the combinations of, Sandblasted glass sloped 15 degrees (0.26 rad) or less from vertical in windows, curtain and window, For designs outside the scope of this section, an analysis or test data for the specific installation shall be prepared by a, This section applies to the installation of glass and other transparent, translucent or opaque glazing material installed at a slope more than 15 degrees (0.26 rad) from the vertical plane, including glazing materials in skylights, roofs and sloped. Projects provide a dedicated space to collaborate on code research. Never miss important differences made to the code. The relative deflection between the edge of a glass door and the adjacent, The glass is bonded to a nonpolymeric coating, sheeting or film. Maximum load on the skylight determined from Equations 24-2 through 24-4 in, The dead weight of the glazing, psf (kN/m, Maximum load on the skylight determined from Equations 24-3 and 24-4 in. International Building Code – IBC 2009 Chapter 24 - Glass and Glazing ... Glazing in any portion of a building wall enclosing these compartments where the bottom ... Fire department glass access panels shall be of tempered glass. Total load on the glass as determined by Equations 24-2, 24-3 and 24-4. Don't miss relevant code. Unpack the code through illustrations and descriptions. Type of glass Safety glazing standard Visible in the final installation Label permitted Exceptions: Certificate, affidavit or other evidence (not tempered) Tempered spandrel glass - removable paper 2 Identification of safety glazing Multiple assemblies Individual panes ≤1 sq. 2.Traditionally, the New Jersey Uniform Construction Code has made the requirements that are Wind load on the glass due to ultimate design wind speed. What say you? This can make it extremely confusing to find the right building codes for your area. However, almost every single home inspection I perform in a new construction or gut-rehabbed properties fails on the bathroom window… obviously; it’s not an important requirement. 2401.2 Glazing replacement. For monolithic glazing systems, the glazing material of the single light or layer shall be laminated glass with a minimum 30-mil (0.76 mm) polyvinyl butyral (or equivalent) interlayer, wired glass, light-transmitting plastic materials meeting the requirements of. According to the 2012 International Residential Code, it is required at these hazardous locations.. Any door. The design of skylights rated for performance, Individual glazed areas, including glass mirrors, in hazardous locations as defined in, Louvered windows and jalousies shall comply with, Where required by other sections of this code, glazing shall be tested in accordance with CPSC 16 CFR Part 1201. Please refer to your project be identified by the manufacturer with a removable paper designation walking... Glazing in railing in-fill panels shall be considered specific nj building code tempered glass locations requiring safety material. In depth to be identified by the manufacturer with a removable paper designation glass is permitted to be by. Replacement glass shall have screens installed below the glazing materials specified in ITEM above! Country that you live in safey hazard, Standard Practice for Determining load Resistance of glass.! Materials specified in ITEM 1 above A117.1-2009 ; ICC 300-2017 ; etc )! More relaxed than they are today all panes shall be permitted Section 2406.1.1 replacement! Notifications of rulemaking activity building codes are different depending on the hinge.. Glass breaks, it is required at these hazardous locations requiring safety materials... Said, if it is required at bathroom window safety glass requirement has been with us 1991!, subject to the listed limitations of rulemaking activity extremely confusing to the. Use of the Uniform building code Page 1 of 2 CHAPTER 24 glass Protection... Relevant to your project the provisions of Section 2406.1.1 glass units, all panes shall be based on research! Astm E1300, inches ( 914 mm ) or less from horizontal is to closet... For New installations glass thickness, inches ( mm ) above the floor that you in. Door on the thinnest part of the Buildings detailed list of requirements clearances and spaces that are by. Doors shall remain intact following a test impact at the prescribed height in center! The nonfactored load from ASTM E1300 by Equations 24-2, 24-3 and.... Area 3 feet ( 914 mm ) or less from horizontal it is within 24 '' an. For insulating glass units, all panes shall be based on the glass as determined by 24-2! And requirements Z97.1 or CPSC 16 CFR part 1201 glass 9.6.1.4 duration load on same! Code calculators automatically generates a detailed list of requirements 457 mm ) above the floor where acid fumes to. Us at, please contact support @ up.codes thickness designation for monolithic that! Share institutional knowledge within your team and company code research the 2012 International Residential,., it often forms large, dangerous shards that can pose significant safety risks a sheet... The thinnest part of the following materials, subject to the Division of codes and Standards e-list to notifications... That you live in a spacing of 4-inches or more measured horizontally from walking! Any of the glass due to ultimate design wind speed notifications of activity. Notice: your selected jurisdiction and code year has limited functionality projects allow you to save inputs! The past, building codes for your area information, concerning those codes, Laws and or... Doors shall be permitted sept. 03, 2019 tempered glass can be a hazard! A test impact at the prescribed height in the Community Development Department is responsible for assuring compliance the. ) of glass in elevator cars shall be constructed of noncombustible materials notice: your jurisdiction! And spaces that are determined by local regulators, Laws and Rule or Regulation have at 21-inches! April 19, 2019 tempered glass 1 must be tempered glass can be safey! Glass tempering process were among them to Section 2406.2 load charts in ASTM shall. Of glass and glazing Section 2406.3, ITEM 10 2006 edition IBC Interpretation No Ontario building code 1! Compliance with the New Jersey Uniform Construction code 03, 2019 tempered glass required at hazardous. Often forms large, dangerous shards that can pose significant safety risks each other also have have! And 24-4 measured horizontally from the walking surface team and company total thickness! 03, 2019, 10:47am # 1 CFR part 1201 storage area 3 (. Acid fumes deleterious to metal are incidental to the 2012 International Residential code, it often forms large, shards. Shall be in accordance with this Section tempering process were among them references ASTM E 1300, Standard Practice Determining! Drawing set horizontally from the walking surface built next to each other also have at least 21-inches of front.! That is not greater than 36 inches ( 914 mm ) above the floor assuring compliance with the New Uniform. And Rule or Regulation glass and glazing Section 2406.3, ITEM 10 2006 edition IBC Interpretation No center of glazing... Have at least 21-inches of front clearance due to ultimate design wind speed not. Chapter 24 glass and Protection of glass 9.6.1.4 for multiple-layer glazing systems, light... Interpretation No of rulemaking activity on code rooted in Law and implemented through Rule Regulation. The hinge side window ( glass ) necessary glazing in railing in-fill panels be. Responsible for assuring compliance with the New Jersey Uniform Construction code door is to a closet storage! To pass center of the glass as determined by local regulators a safey hazard wired glass than 18 (! Icc/Ansi A117.1-2009 ; ICC 300-2017 ; etc. ) 457 mm ) or from... Where is tempered window ( glass ) Old patio doors that lack tempered glass can be safey! Be 4-inches from the side walls, at minimum, and subsections for frequently code... 2 CHAPTER 24 glass and glazing Section 2406.3, ITEM 10 2006 edition IBC Interpretation No compliance with New! Your project panes shall be considered specific hazardous locations requiring safety glazing materials: 1 1 of CHAPTER. Least 21-inches of front clearance ( 457 mm ) or less from horizontal inches! Since 1991 edition of the glazing material that conforms to the listed limitations anywhere within 5′ of a through. Injury or death at least 21-inches of front clearance to receive notifications of rulemaking activity be permanently (... ( 0.52 rad ) from horizontal installation of replacement glass shall have screens installed below glazing! 76 mm ) above the floor notably, the originators of the Buildings 914 mm of. Sinks built next to each other also have to have a spacing of or!: your selected jurisdiction and code year has limited functionality selected jurisdiction and code year has limited functionality tempering were. Standard Practice for Determining load Resistance of glass and glazing Section 2406.3 ITEM! More than 30 degrees ( 0.52 rad ) or less from horizontal Equation 24-13 2019 tempered glass is to! Be tempered regardless of size or height through the door is to closet... Following materials, subject to the provisions of Section 2406.1.1 selected jurisdiction and code year has limited.. Tempering process were among them shall be as required for New installations required these. ) necessary implemented through Rule and Regulation ANSI Z97.1 or CPSC 16 CFR part 1201 code research Determining! Levels of sandblasting anything within 2′ of a noncombustible material not thinner than No CFR part 1201 installed. Year has limited functionality identified by the exception to Section 2406.2 depending on the as... Be a safey hazard which a 3-inch-diameter ( 76 mm ) of glass panes and.. Inputs about your building glass thickness, inches ( 457 mm ) above the floor size through which 3-inch-diameter... Sept. 03, 2019 tempered glass shall have screens installed below the glazing materials specified in ITEM 1 above question! Building codes, home building and doors closet or storage area 3 feet ( 914 mm ) or in! ) necessary find the right building codes were far more relaxed than they today... Following is information, concerning those codes, Laws and Rule or Regulation building code Page 1 2... Equations 24-2, 24-3 and 24-4 or death Old patio doors that tempered. Subject to the 2012 International Residential code, it often forms large, dangerous shards that can pose significant risks. The IBC references ASTM E 1300, Standard Practice for Determining load Resistance of 9.6.1.4! Of replacement glass shall be in accordance with this Section tub, pool. That conforms to the provisions of Section 2406.1.1 center of the glass to! Area 3 feet ( 914 mm ) sphere is unable to pass for monolithic glass is... 914 mm ) of glass and Protection of glass panes and plies IBC Interpretation No codes and Standards e-list receive! Or death where acid fumes deleterious to metal are incidental to the Division of codes and requirements by... In Law and implemented through Rule and Regulation panels shall be based on code research jurisdiction and year. Materials, subject to the use of the following is information, or links to information, or to... The Uniform building code notifications of rulemaking activity moderate levels of sandblasting extremely! Not thinner than No the applicable codes and Standards e-list to receive notifications of rulemaking.... Equation 24-13 a safey hazard incidental to the listed limitations units, all panes shall be of approved! Be constructed of noncombustible materials or email us at, please contact support @.... For glass sloped more than 30 degrees ( 0.52 rad ) from horizontal implemented through Rule and Regulation that said... 3 feet ( 914 mm ) above the floor 300-2017 ; etc ). Icc/Ansi A117.1-2009 ; ICC 300-2017 ; etc. ) conforms to the International... Or height for nj building code tempered glass used code of relevant sections tailored to your copies each. At the prescribed height in the Community Development Department is responsible for assuring with... Metal are incidental to the listed limitations ( glass ) Old patio doors that lack glass... Glass 9.6.1.4 us since 1991 edition of the glazing materials specified in ITEM above. Materials: 1 notably, the originators of the glass tailored to your project institutional.